Date: Saturday, September 29
Time: 8:30am, roll at 8:35am
Location: Templeton Park
Route: Down the Whole Hog – https://www.strava.com/routes/15626599
Distance: 59.8 miles
Note the new, later 8:30am meeting time.
We will head out 5th street to right on Main, left on Templeton Rd and continue straight onto El Pomar, to a left on Hollyhock, left on Neal Spring, right on River Rd, left on Navajo to the bike path detour and reconnect with River (stop 1 – 11 miles). We then continue north on River to a right on Cross Canyon to Ranchita Canyon (stop 2 – 24.7 miles). We then head north, up Ranchita Canyon and the turn right and head down Hog Canyon all the way to Jardine (stop 3 – 41.4 miles). We then head south on Jardine, right on Tower, left on Airport, right on Buena Vista, right on River Oaks, left on River, take the bike path and reconnect to River. Then head south on River to a right on Neal Spring, right on El Pomar, right on Main, and left on 5th back to the start.